What we do

California compliance and commissioning expertise

From pre-design through occupancy, CalgreenCX delivers the technical oversight and compliance management that government agencies require to meet California's Title 24, Title 22, and NFPA mandates.

ASHRAE Cx / Title 24

New Construction Commissioning

Independent verification that all building systems are designed, installed, and operating as intended — from schematic design through the warranty period, in full compliance with California Title 24.

  • Owner's Project Requirements (OPR)
  • Basis of Design (BOD) review
  • Commissioning plan and specifications
  • Construction-phase functional testing
  • Systems manual and O&M training
  • Warranty-period verification

ASHRAE Guideline 0, ASHRAE Guideline 1.1, California Title 24

RCx

Retro-Commissioning

Systematic investigation and optimization of existing building systems to restore or exceed original design performance, reduce energy consumption, and align with current Title 24 requirements.

  • Facility assessment and benchmarking
  • Energy data analysis
  • Functional testing of existing systems
  • Findings and recommendations report
  • Implementation support
  • Measurement and verification

ASHRAE Guideline 0.2, California AB 1103, Title 24

California CBC

Title 24 Compliance Management

California Building Code Title 24 is the primary energy and sustainability compliance framework for new construction and major renovations. We manage the full compliance process — from design-phase documentation through final inspection sign-off.

  • Title 24 compliance strategy and planning
  • Energy compliance documentation coordination
  • Plan review and agency response support
  • Construction-phase compliance verification
  • Certificate of Compliance coordination
  • Post-occupancy compliance review

California Title 24, Parts 6 & 11 (CALGreen), California Building Code

Healthcare Cx

Title 22 Healthcare Compliance

Specialized compliance review for healthcare facilities, hospitals, and nursing facilities under California Title 22. We ensure mechanical, electrical, and life-safety systems meet the heightened requirements for healthcare occupancies.

  • Title 22 compliance gap analysis
  • Healthcare systems commissioning
  • OSHPD coordination support
  • Life-safety systems verification
  • Infection control risk assessment (ICRA) coordination
  • Compliance documentation and reporting

California Title 22, OSHPD, NFPA 99, FGI Guidelines

NFPA 110

NFPA 110 Emergency Power Testing

Testing and certification of emergency generators and separately derived power systems that support healthcare and public safety facilities, per NFPA Standard 110.

  • Emergency generator load bank testing
  • Transfer switch functional testing
  • Separately derived systems verification
  • NFPA 110 compliance documentation
  • Annual testing program development
  • Deficiency tracking and resolution

NFPA Standard 110, NFPA 99, California Title 24 Part 3

LEED AP BD+C

LEED Certification Management

Over a hundred LEED projects completed — from Fundamental certification through Platinum. We support LEED planning and design with owners to establish pathways, budgets, and credit strategies for public safety buildings, courthouses, and post-occupancy evaluations.

  • LEED credit strategy and scorecard
  • Owner pathway planning and budget alignment
  • Documentation coordination and review
  • GBCI registration and submission management
  • Design and construction review responses
  • Post-occupancy evaluation support

LEED v4, LEED v4.1, LEED O+M

Our commissioning process

A structured, phase-by-phase approach that integrates with your project team from day one.

Pre-Design

Establish Owner's Project Requirements, define commissioning scope, and integrate Title 24 and Cx requirements into project specifications.

Design Review

Review design documents for compliance with OPR, Title 24, and applicable standards. Issue formal design review comments.

Construction

Conduct site observations, review submittals, develop functional test procedures, and coordinate pre-functional inspections.

Functional Testing

Execute functional performance tests on all commissioned systems. Document results and track deficiencies to resolution.

Closeout

Deliver final commissioning report, systems manual, and O&M training. Coordinate compliance documentation submission.

Warranty Period

Conduct seasonal testing, verify deferred test completion, and support facility staff during the first year of occupancy.

Ready to scope your project?

Our team reviews RFPs and scoping documents at no charge. Contact us to discuss your Title 24, healthcare compliance, or commissioning requirements.